There will install 2 sets 10t electric-hydraulic multi-petals garbage grab crane for feeding the boiler, mixing, stacking, moving and stirring, and make sure garbage components into the boiler evenly. The operator controls the operation of the grab crane in the fixed garbage crane control room.
The garbage grab crane with manual or semi-automatic control for garbage handling is the core equipment of the garbage feeding system of the municipal solid waste incineration plant, which is located above the garbage storage pit and mainly undertakes the work of garbage feeding, handling, mixing, taking and weighing.
The entire crane is deisgned with A8 extra heavy duty according to the actual operating conditions. According to the the working environment, humanized design, anti-corrosion design are added and foreign advanced technologies are absorbed and optimized. The whole grab crane is suitable for dusty, high humidity and harsh environment work in the garbage station, and the whole crane service life is 30 years.
The electric double girder garbage grab crane, the weight of the whole crane, long travel wheel load, and external dimensions, etc. all meet the requirements of the plant structure. The equipment capacity fully meets the feed productivity needs of the waste power plant, and meets the requirements of stacking, feeding, weighing and operating areas required for production. Through the touch screen to click the position of the grabing and feeding, it can realize the process of automatic grabing, automatic repetitive completion of feeding and stacking, automatic parking and other processes. And has a large lifting height anti-sway, real-time dynamic measurement, programmable control of opening and closing, fault diagnosis alarm and remote fault diagnosis function.
Technical Data
Plant Nominal Capacity
290TPD
720TPD
960TPD
1440TPD
1920TPD
3000TPD
Crane Capacity
5Ton
8Ton
10Ton
15Ton
20Ton
32Ton
Orange Peel Grab
2.5m3
5m3
6.3m3
10m3
14.5m3
20m3
Grab Crane Span
8-39m
8-39m
8-39m
8-39m
8-39m
8-39m
Grab Crane Lifting Height
30m
30m
30m
30m
30m
30m
Lifting Speed(m/min)
30
40
40
40
50
50
Cross Speed(m/min)
50
60
50
50
60
60
Long Travel Speed(m/min)
60
90
90
80
90
90
Motor Control System
VFD
VFD
VFD
VFD
VFD
VFD
Sway Control
Yes
Yes
Yes
Yes
Yes
Yes
Power Supply for CT/LT
Festoon
Festoon
Festoon
Festoon
Festoon
Festoon
Manual/Semi-automated
yes
yes
yes
yes
yes
yes
Automated Control
HMI
HMI
HMI
HMI
HMI
HMI
Main Characteristics:
As a non-standard special crane, garbage grab crane has the following characteristics: (1)Poor working environment: work in a garbage room with high temperature, high humidity, dust, and strong gas corrosion; (2)Heavy workload: 24 hours of continuous work, the average annual working time is about 8000h, the full load rate is high, and the work is frequent; (3)Difficult maintenance: the maintenance environment is harsh, and the various harmful gases of garbage decay increase the difficulty of work and cause great harm to the human body; (4)High reliability requirements: Difficult maintenance and maintenance. If the repair is not timely after a fault occurs, it will affect the operation of the incineration conveyor line, and in severe cases will cause production shutdown.
The Trolley Details Showing
Wasting Handling Grab Cranes Application
Hot Tags: 10t waste incinerator project grab overhead bridge cranes, China, factory, manufacturers, suppliers, made in China